Building an underground substation is far more complex than a conventional one. The unique environment presents significant challenges that require specialized design and equipment.

  • Excavation and Structural Integrity: The initial excavation is a massive undertaking, and the entire structure must be built to withstand immense pressure from the surrounding soil and groundwater. Waterproofing is critical to prevent water ingress.

  • Thermal Management: The compact, enclosed space makes it difficult to dissipate the large amount of heat generated by transformers and switchgear. This requires sophisticated ventilation, air conditioning, and cooling systems to maintain a safe operating temperature.

  • Limited Access and Logistics: Moving massive transformers, switchgear, and cable reels into a confined subterranean space is a major logistical challenge. Specialized lifting and rigging equipment, as well as compact, powerful pulling machinery, is required.

  • Safety and Maintenance: The design must incorporate redundant escape routes, fire suppression systems, and gas monitoring to ensure worker safety. Maintenance is also more complex due to the confined space, requiring specialized tools and procedures.

Jointing and termination are the weakest points of an EHV cable system, requiring an uncompromising focus on quality.

  • Highly Skilled Technicians: Only certified and extensively trained jointing technicians with specific experience in 220 kV systems are permitted to perform these tasks.

  • Cleanliness and Environment: The work is performed in a completely clean, dust-free, and moisture-controlled environment using specialized tents or shelters.

  • High-Quality Kits: We use only pre-tested and type-approved jointing and termination kits from leading manufacturers to guarantee reliability.

  • Shielding and Grounding: The integrity of the cable's shielding and grounding is meticulously re-established at every joint and termination point to manage electrical stress and prevent partial discharge.

A thermal backfill is a critical component of the trench design for 220 kV cables. The primary purpose is to create a consistent, low-resistivity thermal envelope around the cable.

  • Heat Dissipation: The backfill efficiently conducts heat away from the cable to the surrounding soil, preventing the conductor from reaching a temperature that could degrade the insulation.

  • Trench Design: The trench is precisely designed to specific depths and widths to accommodate the cables, ensuring proper separation and thermal management. A protective layer of bricks or concrete slabs is installed over the backfill to prevent any future damage from excavation.

As a provider of comprehensive one-stop supply for underground cable laying equipment, we understand the critical role our tools play in the construction of underground substations. While we don't build the substations themselves, our products are essential for key phases of the project:

  • Cable Installation: We provide the hydraulic cable pullers and cable drum stands necessary to safely and efficiently pull the high-voltage cables from the main transmission lines into the substation. Our equipment is designed to operate in tight, confined spaces.

  • Logistics: Our cable drum trailers and lifting accessories are used to safely transport and handle the heavy, large-diameter cables used in these high-voltage installations.

By offering equipment that is robust, precise, and designed for complex environments, we help our clients overcome the unique challenges of building modern underground electrical infrastructure.

Before a 220 kV cable is put into service, a rigorous testing and commissioning program is conducted to confirm its integrity. This typically includes:

  • Sheath Test (Outer and Inner): A DC voltage test is applied to the cable sheath to check for any damage that might allow moisture ingress.

  • Partial Discharge (PD) Test: This is a crucial test for EHV cables. It detects small electrical discharges in voids or defects within the insulation or joints, which could lead to future failure. The test is performed with a very low frequency (VLF) or AC voltage.

  • High-Voltage (Hi-Pot) Test: A high-voltage test is performed to verify the dielectric strength of the entire cable system, including all joints and terminations.

  • Final Commissioning Report: A comprehensive report is prepared, documenting all test results and confirming the cable system is ready for service.

The method of conductor installation is fundamentally different for overhead and underground projects. These differences dictate the type of equipment used, the process, and the overall complexity.

  • Overhead Conductor Installation: This process, often called tension stringing, involves installing bare conductors on towers or poles high above the ground. The primary goal is to maintain a specific tension and clearance to prevent the conductor from sagging and touching the ground or other objects. It requires specialized equipment to apply and control both pulling and braking forces.

  • Underground Conductor Installation: This process, often called cable pulling or laying, involves placing insulated power cables within a protective conduit buried in a trench. The main challenge is to apply a smooth, controlled pulling force to draw the cable through the conduit without exceeding the manufacturer's specified tension limits, which could damage the insulation.

A method statement for cable laying and termination serves as a crucial project document that outlines the specific procedures, safety measures, and quality controls to be followed. Its purpose is to ensure that all work is executed consistently, safely, and in full compliance with project specifications and international standards. It provides a clear, step-by-step guide for technicians, minimizes the risk of errors, and is essential for both project planning and final inspection.
A method statement is a formal, project-specific document that details the safe and efficient procedure for a particular task, such as laying underground cables. It outlines the step-by-step process, identifies potential hazards, and specifies the necessary safety precautions and quality controls. Its importance lies in ensuring that all project stakeholders—from engineers to on-site technicians—understand and follow a single, standardized plan. This minimizes risks, ensures compliance with regulations, and guarantees the quality and reliability of the installation.

Overhead conductor installation is a meticulous process that uses a push-and-pull system to ensure conductor integrity.

  1. Pilot Line Stringing: A lightweight pilot line is first pulled between the towers using a hydraulic puller.

  2. Pulling Rope Stringing: The pilot line is then used to pull a stronger, anti-twisting braided steel pulling rope through a series of stringing blocks (sheaves) mounted on the towers.

  3. Conductor Stringing: The conductor is attached to the pulling rope using a swivel joint and a conductor pulling grip. A hydraulic tensioner applies back tension to the conductor reel, keeping it elevated off the ground, while the hydraulic puller pulls the rope, drawing the conductor into place.

  4. Sagging and Clipping: The conductor is then "sagged" to its precise tension and secured to the insulators on the towers using clamps.

Key Equipment:

  • Hydraulic Pullers: For pulling the rope and conductor.

  • Hydraulic Tensioners: For applying back tension to the conductor drum.

  • Stringing Blocks: To guide the conductor along the towers and reduce friction.

  • Anti-Twisting Braided Steel Rope: A critical component for safety and efficiency.

  • Swivels and Pulling Grips: To connect the pulling rope to the conductor.

Quality control checks are essential to ensure the integrity and safety of the final installation. These checks are performed at various stages:

  • Pre-installation: Before laying, the cable drum is inspected for any damage, and the cable's insulation is tested using a megger. The trench or duct is also inspected for any sharp objects or irregularities.

  • During Installation: The pulling tension is continuously monitored to ensure it stays within safe limits. Rollers and guides are checked to ensure they are in proper alignment.

  • Post-installation: After the cable is laid and before backfilling, a visual inspection is performed. A final insulation resistance test is conducted to verify the cable's integrity. Accurate records of the laying process, including pulling tension data, are documented for future reference.

A professional cable termination procedure is a detailed process that must be followed precisely to ensure a reliable and safe connection. The essential steps include:

  • Cable Preparation: The cable jacket and insulation layers are carefully stripped back to the required dimensions, exposing the conductors and ensuring no damage to the underlying layers.

  • Stress Control: For high-voltage (HV) cables, a stress control system (e.g., heat-shrinkable or cold-shrinkable tubes) is applied to manage the electrical field at the termination point.

  • Lug or Gland Installation: A lug or ferrule is securely crimped onto the conductor, and a gland is fitted to the cable entry point to provide a seal and mechanical support.

  • Insulation and Sealing: A final layer of insulation and a weather-resistant seal are applied to protect the termination from environmental factors and moisture ingress.

  • Testing: After termination, tests such as insulation resistance and continuity checks are performed to confirm the integrity of the connection.

A comprehensive method statement for underground cable installation should contain several critical sections to ensure clarity and safety:

  • Scope of Work: Clearly defines the project's boundaries, including what is and is not included.

  • References and Standards: Lists all relevant drawings, specifications, and international standards (e.g., IEC) that the work must comply with.

  • Roles and Responsibilities: Assigns clear roles to all personnel, from the project manager to the on-site supervisor.

  • Required Resources: Details the specific tools, equipment (e.g., cable pullers, rollers), and materials (e.g., cable type, backfill) to be used.

  • Work Procedure: Provides a detailed, chronological, step-by-step guide for the entire process, from trench excavation to final testing.

  • Risk Assessment: A crucial section that identifies potential hazards and outlines the control measures to mitigate them.

Underground cable installation is a precise operation focused on protecting the cable from damage as it's pulled through a confined space.

  1. Trenching and Conduit Laying: A trench is dug, and a protective conduit (often PVC or HDPE) is laid inside.

  2. Cable Pulling: A hydraulic cable puller is set up at one end of the conduit. A pulling line is fed through the conduit and attached to the cable using a wire mesh pulling grip and a swivel.

  3. Controlled Pulling: The puller then draws the cable through the conduit. Cable rollers are used at entry points and bends to minimize friction and prevent damage to the cable's outer sheath. The puller's integrated tension monitor ensures the force remains within safe limits.

  4. Splicing and Termination: Once the cable is in place, sections are joined together, and the ends are terminated for connection to the grid.

Key Equipment:

  • Hydraulic Cable Pullers: To provide controlled, measurable pulling force.

  • Cable Drum Stands & Trailers: For safely supporting and unspooling heavy cable reels.

  • Duct Rodders: To initially feed the pulling line through the conduit.

  • Wire Mesh Pulling Grips & Swivels: For a secure, yet flexible, connection.

  • Cable Rollers and Guides: To reduce friction and protect the cable.

A detailed quotation for underground cable laying work is typically broken down into several key components to provide transparency and accuracy. The main cost components are:

  • Labor: This includes the cost of the skilled technicians, electricians, and machine operators required for tasks like trenching, cable pulling, and termination.

  • Materials: The cost of the cable itself is a significant factor. Other materials include ducts, conduits, backfill material (such as sand), warning tapes, and protective covers.

  • Equipment: This covers the cost of using specialized machinery and tools, which may include excavators, trenchers, cable drum trailers, hydraulic winches, and cable rollers.

  • Site Preparation and Reinstatement: Costs associated with preparing the site (e.g., surveying, obtaining permits) and restoring the area after the work is complete (e.g., backfilling, paving).

Safety is paramount during cable laying and termination. A comprehensive method statement must detail strict safety precautions and the correct use of specialized tools:

  • Safety Precautions: Work should only be performed by certified and trained personnel. The circuit must be de-energized, and a lockout/tagout (LOTO) procedure must be in place. Technicians must wear appropriate Personal Protective Equipment (PPE), including insulated gloves, safety glasses, and hard hats.

  • Specialized Tools: Essential tools include precision cable strippers, crimping tools for lugs, and specialized heat guns for heat-shrinkable kits.

  • Measurement and Testing Equipment: A multimeter, a megger (insulation resistance tester), and a high-voltage test kit are required to verify the quality of the termination.

A risk assessment is an integral part of a method statement. It is conducted before the work begins and identifies potential hazards (e.g., trench collapse, damaging existing utilities, electric shock). For each identified hazard, the document specifies a clear control measure (e.g., using trench shoring, conducting a utility survey with ground-penetrating radar, de-energizing cables via a lockout/tagout procedure). This proactive approach ensures that safety is not an afterthought but is built directly into the operational plan, protecting both personnel and equipment.

An initial quotation is an estimate, and the final cost can be affected by unforeseen circumstances. The most common factors that can lead to cost changes include:

  • Site Conditions: Unstable soil, rock, or the presence of existing underground utilities can significantly increase the time and effort required for trenching, leading to higher costs.

  • Cable Type and Length: Any changes in the type of cable or the overall length of the route can directly impact the material cost.

  • Access and Logistics: Projects in densely populated urban areas with limited access or those in remote, difficult-to-reach locations will incur higher logistical costs.

  • Regulatory Changes: Unexpected changes in local regulations or permit requirements can also add to the project's overall cost.

The choice of a termination kit depends on the cable type, voltage, and environmental conditions. The most common types are:

  • Heat-Shrinkable Kits: These use heat-shrinkable tubes and boots that contract when heated, providing a tight, reliable seal.

  • Cold-Shrinkable Kits: This newer technology uses a pre-stretched, elastic tube that shrinks into place without heat, making it a safer and faster option.

  • Push-on / Slip-on Kits: These pre-molded terminations are simply pushed onto the prepared cable end, offering quick and easy installation.

  • Composite or Hybrid Kits: These combine different technologies to provide the best features for specific applications, especially for high-voltage cables.

A well-written method statement will list all the necessary equipment and resources to execute the work properly. For underground cable laying, this would typically include:

  • Cable Laying Equipment: Hydraulic cable pullers, drum stands, cable rollers, and winches.

  • Trenching Equipment: Excavators and tools for manual digging.

  • Testing Equipment: A Megger (insulation resistance tester), multimeter, and high-voltage test kits.

  • Safety Equipment: Personal protective equipment (PPE) such as hard hats, high-visibility vests, and insulated gloves.

  • Materials: Cables, thermal backfill, protective tiles, and jointing kits.

Proper installation of a GEC is essential for safety and must adhere to local and national electrical codes, such as the National Electrical Code (NEC) in the United States.

  1. Select the Grounding Electrode: The first step is to choose an appropriate grounding electrode. Common types include:

    • Ground Rods: Typically 8 feet (2.4m) long, copper-clad steel rods driven vertically into the earth.

    • Building Steel: The metal frame of a building that has a minimum of 10 feet in direct contact with the ground.

    • Concrete-Encased Electrodes (Ufer Grounds): A minimum of 20 feet of bare copper conductor or steel rebar encased in a building's concrete foundation.

    • Metal Underground Water Pipe: A pipe with at least 10 feet in direct contact with the earth. If used, this must be supplemented with an additional electrode, such as a ground rod.

  2. Size the Conductor: The GEC's size must be carefully selected based on the size of the service-entrance conductors, as specified in the NEC (e.g., Table 250.66). Using a conductor that is too small can prevent the system from safely handling a fault current.

  3. Route and Protect the Conductor: The GEC should be installed in a single, continuous length without splices or joints. It must be securely fastened to the surface on which it's run and protected from physical damage, especially in areas where it's exposed. For example, a smaller conductor (e.g., #6 AWG) may require protection in a conduit, while larger conductors may not.

  4. Connect to the Electrode: The GEC must be connected to the grounding electrode using a listed, non-corrosive clamp or fitting. These connections must be made securely to ensure a solid, low-resistance bond.

Get the latest price? We'll respond as soon as possible(within 12 hours)
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.