Answer: Yes. Ningbo Changshi is a leading manufacturer and exporter that offers comprehensive one-stop supply for both overhead and underground power line projects. For overhead transmission line installations, we specialize in high-capacity tension stringing equipment and associated tools. For underground cable laying equipment, our product line includes heavy-duty cable pulling winches, cable rollers, and specialized duct rodders designed to handle the large and heavy cables required for 220kV underground systems. Our dual expertise allows us to provide a complete solution for our customers' diverse project needs.

Answer: The design of a 230kV overhead transmission line involves careful planning to ensure long-term reliability and safety. Key design considerations include climatic conditions, such as wind and temperature, which impact conductor sag and tension, as well as ground clearance requirements to ensure public safety. The selection of the right conductor, such as TACSR or ACSR, and ground wire, like OPGW, is critical for transmission capacity and system protection.

At Ningbo Changshi, we provide a complete suite of transmission line stringing equipment and overhead tools that are essential for the construction process. This includes high-capacity hydraulic pullers and tensioners to precisely install conductors, as well as a variety of clamps, sheaves, and blocks designed for the specific demands of 230kV projects.

Answer: The configuration of a 230kV substation is a significant factor in the reliability and operational flexibility of the entire transmission system. Common configurations, such as the single busbar or double busbar systems, have different implications for maintenance and fault isolation. The equipment within a substation, including high-voltage switchgear, circuit breakers, and surge arresters, must be robust enough to handle the 230kV level.

As a trusted supplier, Ningbo Changshi manufactures a wide array of equipment used in substation construction and maintenance. We offer electrical construction tools and specialized machinery for both conventional Air-Insulated Substations (AIS) and modern, compact Gas-Insulated Substations (GIS). Our products ensure that all connections and components are installed and maintained to the highest standards, guaranteeing system stability and safety.

Answer: Public concern regarding electromagnetic fields (EMF) from high-voltage transmission lines is a common issue. While studies have shown that field intensities drop significantly with distance, proper design is crucial to minimize any potential risk. This includes maintaining adequate right-of-way and ensuring correct conductor spacing and ground clearances.

Our power line construction equipment and safety tools are designed to help our clients meet and exceed international safety standards. We emphasize the use of appropriate stringing methods to achieve the correct sag and tension, which helps maintain the designed clearance from the ground and other structures. Our commitment to safety extends to providing high-quality insulated tools and personal protective equipment for all personnel working on these high-voltage lines.

Answer: The choice between 22kV overhead lines and underground cables depends on factors like cost, safety, and environmental impact. Overhead lines, using bare or Aerial Bundled Cable (ABC), are generally more cost-effective and easier to repair, but can be susceptible to damage from weather, animals, and vegetation. Underground cables offer greater reliability and are often preferred in urban areas or locations with high bushfire risk, as they are protected from external elements.

Ningbo Changshi provides a comprehensive range of equipment for both applications. For overhead lines, we supply all the necessary transmission line tools, accessories, and stringing equipment. For underground projects, our cable laying equipment and tools, such as cable pullers and rollers, are designed for efficient and safe installation. We help our clients choose the right equipment for their specific project needs.

Answer: A 22kV substation is a critical hub that steps down high-voltage power for local distribution. Essential equipment includes power transformers to convert voltage, switchgear and circuit breakers for protection and control, and various types of insulators and busbars for safe current flow. The proper functioning of these components is vital for maintaining consistent and safe power delivery to end-users.

Ningbo Changshi is a leading manufacturer of the tools and equipment needed to build, maintain, and expand these substations. Our products, from hydraulic press tools for cable terminations to various overhead accessories, ensure that every component is installed with precision and reliability. We support our customers with high-quality equipment that guarantees the long-term performance and safety of their 22kV substations.

Answer: Improving the reliability of a 22kV distribution network is a top priority for power utility companies. This can be achieved through a multi-faceted approach, including modernizing aging infrastructure, implementing proactive maintenance programs, and utilizing advanced technologies for fault detection and mitigation. Key strategies include converting bare overhead lines to more resilient Aerial Bundled Cable (ABC) and installing specialized equipment like Rapid Earth Fault Current Limiters (REFCLs) in high-risk areas to reduce bushfire risk.

Our equipment at Ningbo Changshi is instrumental in these upgrades. We offer state-of-the-art tools for the conversion of overhead lines and for the maintenance of substation assets. Our products are designed to help operators enhance network stability, minimize downtime, and ensure a safer, more reliable power supply for their customers.

Answer: The push for smart grid integration is a major trend in 2025, transforming the overhead line equipment market. This shift is driven by the need for greater network resilience, the efficient integration of renewable energy sources, and the demand for real-time monitoring. Utilities are increasingly looking for overhead line products with integrated IoT sensors, communication hardware, and other smart features that enable predictive maintenance and enhance grid stability.

At Ningbo Changshi, we recognize this trend and ensure our equipment is compatible with modern smart grid systems. Our extensive range of overhead line tools and accessories are designed to support the installation and maintenance of these advanced systems, helping our clients build a more intelligent and reliable power grid.

Answer: Innovations in materials and hardware for overhead lines in 2025 are primarily focused on improving durability, efficiency, and installation speed. We are seeing a rising demand for high-temperature low-sag (HTLS) conductors that can carry more power with less thermal expansion, as well as the adoption of more durable and lightweight composite components. There is also a growing focus on the use of prefabricated modular components and tool-less designs for hardware, such as snap-on bases and infinitely adjustable clamps, which significantly reduce installation time and labor costs.

Ningbo Changshi stays at the forefront of these innovations. Our products, from specialized tension stringing equipment to a wide array of overhead tools and accessories, are engineered to meet the demands of these new materials and designs, ensuring that our customers can complete their projects efficiently and safely.

Answer: In 2025, technologies like drones and robotics are revolutionizing the inspection and maintenance of overhead distribution lines, making these tasks safer, faster, and more accurate. Drones equipped with high-resolution cameras and thermal sensors can perform rapid inspections of power lines and assets, identifying potential issues like corrosion or hot spots without requiring a human crew to climb poles. The use of these technologies reduces worker risk, minimizes power interruptions, and provides valuable data for predictive maintenance programs.

Our company manufactures high-quality overhead transmission line equipment that is built to last and is easy to inspect using these modern methods. Our tools are designed for efficient repairs and maintenance, ensuring that when an issue is detected, our clients have the most reliable equipment to perform the necessary work, minimizing downtime.

Answer: The most prevalent faults in 33kV distribution networks are single line-to-ground faults (SLGF), accounting for 60-80% of all faults. Other common types include double line-to-ground and three-phase faults. Locating these faults quickly is critical for system reliability. While traditional methods involve manual trial-and-error, modern solutions utilize advanced protection relays and fault location systems. We offer a range of equipment designed to support these advanced systems, ensuring rapid fault identification and minimal downtime.
Answer: The design and construction of a 33kV overhead line must balance conductor sag and tension to ensure reliability and safety. Excessive tension can lead to premature conductor failure due to vibration, while too much sag increases the risk of ground clearance issues and uses more conductor material, raising project costs. Our equipment, including tension stringing equipment and conductor accessories, is engineered to facilitate precise sag and tension control, ensuring lines are installed to meet specific regulatory and engineering standards for different terrains and environmental conditions.
Answer: Underground cables offer several advantages, including improved environmental aesthetics, lower maintenance due to protection from weather and vandalism, and enhanced safety. They are the preferred choice in densely populated urban areas and environmentally sensitive regions. However, they present challenges such as higher initial installation costs, more difficult and time-consuming fault tracing, and thermal management issues due to poor heat dissipation. We provide specialized underground cable laying equipment and tools designed to address these challenges, ensuring efficient installation and long-term reliability.
Answer: The rapid increase in distributed generation (DG) connections, particularly for projects over 5MW, is placing new demands on the 33kV network. These connections can lead to network constraints, voltage fluctuations, and power quality issues. Solutions like Active Network Management (ANM) schemes and compact substations are being developed to manage these challenges. We provide a full range of equipment and accessories that are compatible with these modern grid solutions, helping to facilitate the integration of new energy sources while maintaining grid stability.
The design and construction of a 400 kV transmission line present several challenges that require specialized equipment and expertise. Key considerations include selecting the right tower types (e.g., steel lattice towers) for terrain and weather conditions, ensuring sufficient safety clearances for both people and the environment, and managing the environmental impact of the line's route. We at Ningbo Changshi provide a complete range of overhead transmission line equipment and stringing equipment designed to meet these challenges, from managing conductor tension to ensuring precise and safe tower assembly.
For 400 kV transmission lines, common conductors include ACSR (Aluminum Conductor Steel Reinforced), which is known for its high strength-to-weight ratio. The choice of conductor, such as MOOSE ACSR, is critical for a project's technical and economic viability. The selection process involves considering factors like current carrying capacity, mechanical strength, and weather conditions. Additionally, specialized conductor clamps, insulator fittings, and grading rings are essential to manage high voltage and prevent corona discharge. Our company manufactures a variety of these tools and accessories, ensuring a reliable and safe installation.
400 kV substation maintenance requires strict adherence to safety protocols and the use of specialized tools. Key equipment in these substations includes circuit breakers, isolators, earthing switches, and transformers. Maintenance involves routine inspections, testing, and a comprehensive understanding of the protective devices. Our product line includes a wide array of electrical construction and maintenance tools for substations, from earthing equipment for discharging residual voltage to insulation testing devices that ensure operational safety for your technicians.
Building a power line over such a vast distance presents unique technical challenges beyond standard projects. The main concerns include power loss and voltage drop. As electricity travels over long distances, a significant amount of energy is lost as heat due to the conductor's resistance, and the voltage gradually decreases. To mitigate this, engineers must carefully choose the right conductor material and design. Our company specializes in providing high-quality, low-resistance conductors and accessories that are essential for minimizing these losses and ensuring efficient power delivery. Additionally, dealing with phenomena like corona discharge and electromagnetic interference (EMI) requires specialized equipment and design, all of which fall within our product expertise.
The sheer length of an 800km+ project means that logistics and project management are paramount to success. This includes the strategic transportation of thousands of tons of steel towers, conductors, and a wide array of tools and equipment to often remote and challenging terrains. Planning must account for diverse geographic conditions, from mountainous regions to dense forests, which can significantly impact the choice of equipment and construction methods. Ningbo Changshi offers comprehensive one-stop supply and services, ensuring all your stringing and laying equipment, from conductor pullers to tensioners, is coordinated and delivered on time, minimizing project delays and costs.
For projects exceeding 800km, the efficiency and reliability of the stringing equipment directly impact the project timeline and budget. Using outdated or unreliable tools can lead to frequent breakdowns, which cause costly delays and safety risks. Our OHTL wire cable conductor tension stringing equipment is engineered for high performance and durability, designed to handle the continuous, heavy-duty work required for such long stretches. By using our specialized equipment, you can ensure a smoother, faster, and safer stringing process, which is critical for meeting aggressive project deadlines.
Get the latest price? We'll respond as soon as possible(within 12 hours)
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.