While the choice between underground and overhead transmission lines depends on specific project requirements, environmental factors, and budget, there are clear trade-offs.

  • Advantages of Underground Lines:

    • Aesthetic and Environmental: They eliminate the visual impact of towers and lines, making them ideal for urban, scenic, or environmentally sensitive areas. They also pose no hazard to wildlife or low-flying aircraft.

    • Increased Reliability: Underground lines are shielded from most weather-related disruptions, such as high winds, ice storms, and lightning strikes, leading to fewer outages.

    • Safety: The buried cables reduce the risk of public exposure to live wires and are less susceptible to vehicle accidents or vandalism.

  • Disadvantages of Underground Lines:

    • Higher Cost: The installation cost is significantly higher, often 2.5 to 10 times more than overhead lines due to extensive civil works like trenching and the use of specialized insulated cables and backfill materials.

    • Complex Maintenance: Locating and repairing a fault in an underground cable is a time-consuming and labor-intensive process, potentially leading to much longer outage times compared to overhead lines, which can be repaired in hours or days.

    • Heat Dissipation: Underground cables have a lower capacity for heat dissipation, which requires the use of larger conductors and specialized thermal materials to prevent overheating.

At Ningbo Changshi, we offer a comprehensive range of Underground Cable Laying Equipment and tools designed to address these challenges, ensuring efficient and precise installation for a variety of project scales.

Preventing transmission line failures requires a multi-faceted approach focused on proactive maintenance and using high-quality equipment. Key strategies include:

  • Regular Inspections: Implementing scheduled inspections, often with specialized equipment like drones, can help identify aging or damaged components before they fail.

  • Vegetation Management: A consistent program for trimming trees and clearing rights-of-way prevents foliage from interfering with the lines.

  • Using Durable Equipment: Deploying robust conductors, insulators, and hardware that are designed to withstand harsh weather conditions is essential for long-term reliability.

  • Transposition: On three-phase lines, transposition schemes are implemented to ensure electrical balance and reduce the risk of faults. At Ningbo Changshi, we provide a wide range of tools and equipment designed for the construction and maintenance of power lines, helping you ensure a reliable and resilient grid.

The installation of underground cables is a complex process that requires specialized tools and equipment to ensure efficiency, safety, and the longevity of the cable. The two primary methods are:

  1. Trenching: This involves excavating a trench, laying ducts and conduits, and then pulling the cables through. The trench is then backfilled with thermal concrete and special backfill materials. This method is common for open-area installations.

  2. Horizontal Directional Drilling (HDD): This trenchless method is used to install conduits under obstacles like roads, rivers, and existing infrastructure. It minimizes surface disruption and is a preferred method in densely populated areas.

As a prominent manufacturer, Ningbo Changshi provides a full suite of Underground Cable Laying Equipment for both methods. Our product range includes:

  • Cable Pulling Winches: To manage the high pulling forces required for long cable runs.

  • Cable Rollers and Sheaves: To protect the cable jacket and reduce friction during the laying process.

  • Cable Drum Stands and Jacks: To safely handle and unspool large cable drums.

  • Conduit Rodders and Accessories: Essential for preparing ducts and pulling pilot lines.

Our equipment is engineered for durability and precision, making the installation process safer and more cost-effective.

In OHTL projects, a wide range of connectors and fittings are used to join conductors, connect them to insulators, and terminate them at towers or poles. The main types include:

  • Compression Connectors: These are installed using hydraulic compression tools and dies to form a secure, permanent mechanical and electrical joint. They are widely used for splicing conductors and creating dead-end connections.

  • Wedge Connectors: These utilize a wedge-shaped piece to create a high-pressure, secure connection without the need for compression tools, making them useful for tap connections.

  • Bolted Connectors: These use bolts and nuts to clamp conductors together. While they offer easy installation and removal, they are primarily used in lower-voltage applications or for temporary connections.

The field of underground power transmission is constantly evolving, driven by the need for higher capacity, improved efficiency, and enhanced reliability. Some of the most significant advancements include:

  • Cross-Linked Polyethylene (XLPE) Cables: XLPE is now the industry standard for solid dielectric insulation, replacing older fluid-filled systems. These cables are more reliable, require less maintenance, and are easier to install.

  • High-Voltage Direct Current (HVDC) Cables: HVDC technology is gaining traction for long-distance underground transmission. It offers a significant advantage over AC lines by eliminating charging current issues, which limit the length of AC underground cables, and by reducing energy loss.

  • High-Temperature Superconducting (HTS) Cables: Although still a developing technology, HTS cables have the potential to carry far more power than conventional cables with virtually no energy loss, all within a smaller footprint.

  • Integrated Monitoring Systems: Modern cables are being integrated with fiber optic sensors and other monitoring technologies to provide real-time data on temperature, pressure, and potential faults. This allows for proactive maintenance and quicker fault location, mitigating one of the key disadvantages of underground systems.

At Ningbo Changshi, we are committed to providing the tools and equipment needed to handle these next-generation technologies. Our products are designed to support the specialized installation and maintenance requirements of today's most advanced underground cable laying projects.

The classification of voltage levels varies slightly by region and governing body, but a general framework is widely accepted in the power industry.

  • High Voltage (HV): Typically refers to voltages in the range of 100 kV to 230 kV. These lines are used for regional power transmission, moving electricity from larger substations to smaller ones that serve cities and large industries.

  • Extra-High Voltage (EHV): Encompasses voltages from 345 kV up to 765 kV. EHV lines are the backbone of the power grid, responsible for long-distance, bulk power transfers from major generating stations to regional hubs.

At Ningbo Changshi, we offer a wide array of Overhead Transmission Line Equipment and tools designed for safe and efficient work across these entire voltage ranges. Our products, such as our tension stringing equipment, are engineered to handle the demanding requirements of both HV and EHV projects.

The use of high voltage is a fundamental principle of modern power transmission, as it dramatically increases efficiency and minimizes energy loss. According to the power loss formula (P_loss = I²R), energy loss is proportional to the square of the current (I). By using a step-up transformer to increase the voltage, the current can be significantly reduced while keeping the power (P = VI) constant. A lower current results in less heat generated in the conductors, thus reducing resistive losses and ensuring more power reaches its destination.

Our company, Ningbo Changshi, manufactures the essential Overhead Transmission Line Equipment that makes this process possible. This includes conductor stringing equipment, which is critical for installing the conductors that carry these high voltages across vast distances with minimal sag and maximum efficiency.

A power grid consists of four main stages, each with its own voltage levels:

  1. Generation: Power plants generate electricity at relatively low voltages, typically from 11 kV to 33 kV.

  2. Transmission: The voltage is stepped up to very high levels (132 kV to 765 kV) for efficient long-distance transport via transmission towers and lines.

  3. Sub-transmission/Primary Distribution: The voltage is stepped down to medium levels (e.g., 33 kV, 66 kV) to move power closer to populated areas.

  4. Distribution: Finally, the voltage is reduced to low levels (e.g., 220V, 400V) for safe use in homes, commercial buildings, and factories.

Our comprehensive product line, including Overhead Transmission Line Equipment and Underground Cable Laying Equipment, supports every stage of this process, from initial construction to ongoing maintenance. We provide a one-stop supply for all the tools needed to build and maintain a reliable and efficient power grid.

High-voltage overhead transmission lines can operate with either Alternating Current (AC) or Direct Current (DC), and the choice depends on the project's specific requirements, particularly the transmission distance and power capacity.

  • HVAC (High-Voltage AC): This is the most common form of power transmission globally. It is highly effective for short to medium distances and is seamlessly integrated with the existing grid infrastructure. However, HVAC systems have losses due to factors like line capacitance and the skin effect, which limit their efficiency over very long distances.

  • HVDC (High-Voltage DC): HVDC technology is the preferred choice for transmitting large amounts of power over extremely long distances, especially for subsea cables or connecting asynchronous AC grids. HVDC lines experience lower electrical losses and are more stable over vast geographical areas. The trade-off is the higher cost and complexity of the converter stations required at each end of the line.

At Ningbo Changshi, we manufacture high-quality Overhead Transmission Line Equipment for both HVAC and HVDC projects, including specialized tools and tension stringing equipment that are critical for installing and maintaining these complex systems.

The safety and reliability of overhead transmission lines are paramount. Regular maintenance and strict adherence to safety protocols are essential to prevent hazards such as flashovers, conductor failures, and environmental risks.

  • Routine Inspections: Periodic inspections using specialized tools are crucial to identify signs of wear, corrosion on conductors, or damage to insulators and towers.

  • Vegetation Management: Maintaining adequate clearance between lines and vegetation is a critical safety measure to prevent faults and outages.

  • Equipment Maintenance: Components such as insulators and conductor accessories need to be checked and, if necessary, replaced to ensure the integrity of the line.

Our company provides a full suite of Overhead Tools and Accessories and has extensive experience in supplying reliable equipment for the construction, inspection, and maintenance of high-voltage lines, helping our customers ensure the safety and longevity of their power grids.

The design of a high-voltage overhead transmission line is a sophisticated engineering process focused on efficiency, safety, and reliability. Key design elements include:

  • Voltage Level: Using higher voltages reduces the current required to transmit the same amount of power, which in turn significantly lowers resistive power loss (I²R losses).

  • Conductor Type and Size: Engineers select conductors with high conductivity and appropriate cross-sectional area to handle the current load with minimal resistance. For Extra-High Voltage (EHV) lines, bundled conductors are often used to reduce corona discharge and its associated power loss.

  • Tower and Insulator Design: The size and spacing of towers, as well as the type of insulators (e.g., suspension or post insulators), are carefully chosen to maintain a safe distance between conductors and the ground, and to prevent electrical leakage.

As a leading manufacturer, Ningbo Changshi provides the advanced Overhead Transmission Line Equipment and tools necessary to implement these design principles. Our tension stringing equipment is specifically engineered for the precise and safe installation of conductors, ensuring the structural integrity and operational efficiency of high-voltage overhead lines.

Transmission line workers, or linemen, undergo rigorous training to ensure they can safely and effectively work with high-voltage electricity. This training covers everything from basic electrical theory and safety protocols to advanced techniques for installing and maintaining overhead and underground power lines. Essential skills include pole climbing, operating specialized machinery, and understanding live-line work procedures.

The job demands a wide range of specialized tools and equipment to perform tasks safely and efficiently. These include tension stringing equipment for conductor installation, insulated tools for live-line work, and various accessories for securing and maintaining lines. Ningbo Changshi is proud to be a one-stop supplier of all this equipment, offering everything from Overhead Transmission Line Equipment to specialized Underground Cable Laying Equipment that meets international safety and performance standards.

Safety is the top priority for any work involving high-voltage lines. Key safety practices and procedures are designed to protect workers from electrocution, arc flashes, and falls. These include:

  • Lockout/Tagout (LOTO): Ensuring lines are de-energized and properly grounded before any work begins.

  • Maintaining Safe Distances: Always keeping a safe clearance from live conductors to prevent "flashovers," where electricity can jump through the air.

  • Use of Personal Protective Equipment (PPE): This includes insulated gloves, sleeves, hard hats, and flame-resistant clothing to protect against electrical hazards.

Our company manufactures high-quality Overhead Tools and Accessories that are essential for these safety practices. We provide equipment designed for reliable grounding, insulation, and handling of conductors, which are crucial for every job site to ensure the well-being of transmission line workers.

Transmission line workers face numerous challenges, from working at great heights in varying weather conditions to managing the physical and technical demands of the job.

  • Logistical Complexity: Installing or repairing lines, especially in difficult terrains or over long distances, requires precise planning and the use of heavy-duty tension stringing equipment to manage conductor sag and tension.

  • Live-Line Work: In many cases, workers must perform maintenance on energized lines to avoid power outages. This requires specialized insulated tools and a high degree of skill and focus.

  • Underground Operations: For underground projects, workers must navigate confined spaces and use specific Underground Cable Laying Equipment to install cables without damaging them.

Ningbo Changshi specializes in providing the reliable Overhead and Underground Equipment needed to overcome these challenges. Our tools are engineered for durability and efficiency, making the difficult work of power line construction and maintenance safer and more manageable for workers worldwide.

A 132 kV transmission line is a crucial part of the electrical grid, and its design is governed by strict international standards to ensure safety and reliability. Key technical specifications include:

  • Conductors: These lines often use Aluminum Conductor Steel Reinforced (ACSR) or similar composite conductors, which are chosen for their strength and electrical properties. Our tension stringing equipment is specifically designed to handle the precise tensioning and stringing of these high-capacity conductors.

  • Insulators and Hardware: Polymer or composite insulators are commonly used to support conductors and prevent current from leaking to the tower. The lines also require robust hardware like suspension clamps, tension clamps, and vibration dampers to protect against weather and environmental stresses. Ningbo Changshi supplies a full range of these essential Overhead Tools and Accessories, ensuring every component meets the highest quality standards.

  • Towers and Spans: The line is supported by steel lattice towers or wood poles with an average span length that is carefully calculated based on factors like wind load, temperature, and terrain.

The long-term performance and safety of a 132 kV overhead line depend on regular, meticulous maintenance. Procedures often include:

  • Component Inspection: Regular inspections are conducted to check the condition of conductors, insulators, and tower hardware for signs of corrosion, damage, or wear. Worn-out fittings, such as U-bolts and shackles, are a common issue that requires replacement to prevent structural failure.

  • Refurbishment and Replacement: Over time, components like conductors and earthwires may need to be reconductored or replaced entirely. Specialized equipment is needed for these tasks to ensure the work is done without compromising the line's integrity.

At Ningbo Changshi, we offer all the necessary Overhead Transmission Line Equipment for these maintenance and refurbishment projects, from conductor stringing tools to specialized lifting and handling gear.

A 132 kV substation is a complex hub that steps down voltage and distributes power. Its operation is managed by a suite of critical equipment:

  • Bus Bars: These are the central connection points for incoming and outgoing lines, typically made of aluminum or copper.

  • Circuit Breakers: These devices automatically interrupt the flow of electricity during a fault to prevent damage to other equipment.

  • Isolators and Disconnect Switches: Used to physically isolate sections of the substation for maintenance, ensuring worker safety.

  • Surge Arresters: These are installed to protect the substation from overvoltage caused by lightning strikes or switching surges.

We supply a comprehensive range of Overhead Tools and Accessories that are vital for the construction and maintenance of these substations, including all the necessary grounding equipment, insulated tools, and cable laying equipment to ensure safe and reliable connections.

Answer: The construction of a 220kV overhead transmission line requires a comprehensive suite of specialized tools and equipment to ensure safety, efficiency, and reliability. Key components include robust transmission towers (lattice or steel poles), high-performance conductors (such as ACSR), and various types of insulators (glass, porcelain, or polymer). The construction process, particularly the conductor installation, relies heavily on advanced tension stringing equipment, including hydraulic pullers, tensioners, and anti-twist ropes. At Ningbo Changshi, we provide a full range of these tools and accessories, including specialized ground wire stringing blocks, conductor clamps, and tower erection equipment, to facilitate the entire construction process from foundation to final sag and tension.
Answer: Minimizing power losses is a critical aspect of designing and operating a 220kV transmission system. Losses can be categorized as resistive (I²R), which is related to the conductor's resistance, and corona losses, which are caused by the ionization of air around the conductors. To mitigate these, we ensure our clients have access to the highest quality materials and equipment. This includes supplying low-resistance ACSR conductors with optimal cross-sectional areas and diameters to reduce Ohms loss. Additionally, for overhead transmission line projects, we provide tools and accessories that support proper conductor tension and sag, which are crucial for maintaining the required clearances and minimizing environmental losses.
Answer: Maintenance and safety are paramount for ensuring the continuous and reliable operation of a 220kV transmission line. Regular inspections and planned maintenance outages are essential to check for conductor wear, insulator damage, and tower structural integrity. Our comprehensive range of power line maintenance tools includes specialized conductor grips, insulated tools for live-line work, and equipment for conductor replacement and repair. We also emphasize the use of high-quality grounding devices and safety gear to protect workers during all phases of electrical construction and maintenance, adhering to international safety standards.