How do I properly terminate an armored cable with a gland?

2025-08-14

Proper termination is critical for maintaining the cable's integrity and safety. Here is a step-by-step guide:

  1. Measure and Cut: Accurately measure the required length and use a suitable cable cutter to make a clean, straight cut without damaging the internal conductors.

  2. Strip the Outer Sheath: Carefully remove the outer PVC sheath to expose the steel wire armor. Be careful not to nick the armor or the inner layers.

  3. Prepare the Gland: Slide the gland nut and compression ring onto the cable.

  4. Expose Conductors: Cut the steel wire armor to the required length, then strip the inner insulation to expose the conductors.

  5. Connect the Gland: Position the gland over the armor wires, ensuring they are evenly spread. Tighten the gland to secure the armor, and use an earth tag to connect the armor to the equipment's earth terminal, ensuring proper grounding.

  6. Final Connection: Insert and terminate the conductors into the equipment, following wiring regulations.

We offer a full range of cable laying equipment and tools to ensure every step of this process is executed with precision and safety.

Get the latest price? We'll respond as soon as possible(within 12 hours)
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.