
How can electrical distribution lines be made more resilient against natural disasters and extreme weather?
2025-08-17
Answer: The primary strategy for enhancing grid resilience is through robust construction and the strategic use of specialized equipment. Our heavy-duty overhead stringing equipment can handle the installation of stronger, more durable conductors and poles. Additionally, our advanced underground cable laying equipment and tools are crucial for burying power lines, a proven method for protecting them from wind, ice, and falling trees. By utilizing our tools, utility companies can implement "storm hardening" techniques that significantly reduce the frequency and duration of weather-related outages.
Get the latest price? We'll respond as soon as possible(within 12 hours)