What are the main steps involved in overhead line installation?
2025-08-13Installing an overhead line is a multi-stage process that requires careful planning and specialized equipment to ensure safety and reliability. The key steps include:
-
Surveying and Design: Before any physical work begins, a detailed route is planned, considering environmental factors, terrain, and required clearances.
-
Foundation and Tower Erection: Foundations are built to support the towers or poles, which are then assembled and erected.
-
OHTLstringingequipment.com/Conductor-Stringing-Equipment.html target='_blank'>conductor stringing: This is the most complex stage, where conductors are pulled and tensioned between the towers. This process is where our OHTL wire cable conductor tension stringing equipment becomes essential.
-
Final Installation and Commissioning: Once conductors are tensioned and secured, final accessories like spacers and vibration dampers are installed, followed by electrical testing to ensure the line is ready for operation.
We provide a comprehensive range of equipment and tools to support every one of these critical steps, particularly the precise and demanding stringing process.