What are the main steps involved in overhead line installation?

2025-08-13

Installing an overhead line is a multi-stage process that requires careful planning and specialized equipment to ensure safety and reliability. The key steps include:

  1. Surveying and Design: Before any physical work begins, a detailed route is planned, considering environmental factors, terrain, and required clearances.

  2. Foundation and Tower Erection: Foundations are built to support the towers or poles, which are then assembled and erected.

  3. OHTLstringingequipment.com/Conductor-Stringing-Equipment.html target='_blank'>conductor stringing: This is the most complex stage, where conductors are pulled and tensioned between the towers. This process is where our OHTL wire cable conductor tension stringing equipment becomes essential.

  4. Final Installation and Commissioning: Once conductors are tensioned and secured, final accessories like spacers and vibration dampers are installed, followed by electrical testing to ensure the line is ready for operation.

We provide a comprehensive range of equipment and tools to support every one of these critical steps, particularly the precise and demanding stringing process.

Get the latest price? We'll respond as soon as possible(within 12 hours)
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.