What are the essential pre-pull planning steps for a successful installation?

2025-08-15

A safe and efficient pull begins long before any equipment is turned on. Key pre-pull planning steps include:

  • Route and Site Inspection: Conduct a thorough inspection of the entire pulling route to identify and mitigate any potential hazards, such as sharp edges, existing utilities, or difficult terrain.

  • Tension and Sag Calculations: Accurately calculate the maximum pulling tension and sag requirements for the conductor. This data dictates the type of equipment, pulling rope, and accessories needed for the job.

  • Equipment and Material Staging: Strategically place all equipment, including the puller-OHTLstringingequipment.com/Hydraulic-Conductor-Tensioners.html target='_blank'>Tensioner, conductor reels on jack stands, and OHTLstringingequipment.com/Stringing-Blocks--Sheaves.html target='_blank'>Stringing Blocks, to ensure a smooth workflow and a safe "lead-in angle" for the conductor. * Safety Briefing and PPE: A detailed safety briefing for all crew members is mandatory, along with a check to ensure everyone has the correct personal protective equipment (PPE).

Get the latest price? We'll respond as soon as possible(within 12 hours)
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.