
Can your equipment be used on energized/live lines?
2025-08-19Short answer: Live-line work requires specialized hot-stick rated tools, insulated rigs and qualified live-line crews. Most heavy tensioning is done de-energized and grounded—consult utility protocols. If live-line methods are required, request our insulated tool and hot-stick compatible product options.
Get the latest price? We'll respond as soon as possible(within 12 hours)