How is the shift to renewable energy changing the requirements for power line construction equipment?
2025-08-17
Answer: The massive growth of renewable energy sources, like solar and wind farms, is decentralizing the grid. This is changing power line construction in several key ways. First, there's a higher demand for underground cable laying equipment as many new generation sites and battery storage systems are being connected via underground lines to minimize land use and visual impact. Second, the need for a more dynamic and resilient grid means equipment must be compatible with smart grid technologies and conductors that can handle bidirectional power flow. Our equipment is designed to meet these new demands, providing the necessary tools for both the overhead and underground portions of modern grid projects.