What are the key stages in the construction of an Overhead Transmission Line (OHTL)?
2025-08-10The construction of an OHTL is a multi-phase process that requires meticulous planning and specialized equipment. The key stages typically include:
-
Surveying and Route Selection: Identifying the most suitable and cost-effective path for the transmission line, considering geographical and environmental factors.
-
Foundation Work: Installing the foundations that will support the towers or poles. This includes geotechnical surveys and foundation design.
-
Tower Assembly and Erection: Assembling the lattice steel towers or erecting utility poles. Specialized cranes and lifting equipment are used for this critical step.
-
OHTLstringingequipment.com/Conductor-Stringing-Equipment.html target='_blank'>conductor stringing: The process of pulling and tensioning the conductors between the erected towers. This is where high-quality hydraulic puller-Tensioners and stringing equipment are essential.
-
Final Connections and Commissioning: Attaching insulators, clamps, and other accessories, followed by comprehensive testing to ensure the line is ready for operation.