What are the key sections of a comprehensive method statement for power cable laying?

2025-08-14

A comprehensive method statement for power cable laying is a detailed plan that ensures the project is executed safely and efficiently. The key sections typically include:

  • Project Details: Identification of the project, site location, and relevant personnel.

  • Scope of Work: A clear outline of the tasks to be performed, including trenching, cable installation, backfilling, and reinstatement.

  • Safety Plan: A mandatory section detailing risk assessments, required Personal Protective Equipment (PPE), and emergency procedures.

  • Sequence of Work: A step-by-step description of the cable laying process, from site mobilization to final handover.

  • Equipment and Tools: A list of all machinery and specialized tools to be used, such as cable pullers, winches, drum stands, and rollers.

  • Quality Control: Procedures for inspecting materials and verifying that the installation meets all required standards and specifications.