How is a horizontal directional drilling (HDD) machine used for cable installation?
2025-08-14The HDD process for cable installation typically involves three main stages:
-
Pilot Bore: The machine drills a small-diameter pilot hole from a designated entry point to an exit point, following a carefully planned path to avoid obstacles.
-
Pre-reaming: A reamer is attached to the drill string and pulled back through the pilot bore to enlarge the hole to the required diameter for the cable or conduit.
-
Cable Pullback: The cable or conduit is attached to the reamer with a Swivel, and the rig pulls it back through the enlarged bore, completing the installation with minimal surface disturbance.