What is the typical process for a professional underground fiber optic cable installation?
2025-08-16A professional underground fiber optic cable installation is a multi-phase process that requires meticulous planning and the use of specialized tools to protect the delicate fiber.
-
Site Survey and Planning: This is the most crucial phase. It involves a thorough site assessment to determine the best route, identify existing underground utilities to prevent damage, and calculate the pulling tension and bend radius requirements for the specific cable being used.
-
Trenching or Conduit Laying: A trench is excavated along the planned route. For most fiber optic installations, a conduit is laid inside the trench. This conduit acts as a protective pathway for the cable, shielding it from moisture, chemicals, and mechanical damage. It also makes future repairs or upgrades much easier.
-
Cable Pulling or Blowing: This is the core installation step. There are two primary methods:
-
Pulling: The most common method involves a pulling rope and a hydraulic cable puller. The rope is fed through the conduit using a duct rodder. The cable is then attached to the rope with a special Swivel and pulling grip and is pulled through the conduit.
-
Blowing: A more advanced method uses a fiber blowing machine and compressed air to push the fiber optic cable through the duct. This technique is often used for long distances and complex routes with many bends, as it creates less friction and stress on the cable.
-
-
Splicing and Termination: Once the cable is in place, the individual fibers are connected to other cables or equipment. This is done through splicing, a process of fusing two fibers together with a machine, or termination, which involves installing a connector on the end of the fiber. This phase is critical for ensuring the signal's integrity and minimizing attenuation (signal loss).
-
Testing and Commissioning: After installation, the cable is tested using tools like an Optical Time-Domain Reflectometer (OTDR) to verify its performance. This test confirms that the cable was not damaged during the installation process and that signal loss is within acceptable limits.