- Home
- >
- News
- >
- Company news
Company news
Ningbo Changshi Opens New European Service & Parts Hub to Speed Delivery
To reduce lead times and improve after-sales support, Ningbo Changshi opens a dedicated European service & parts hub — faster spare delivery and onsite technicians.
2025/11/03
MORE
Ningbo Changshi Launches Next-Gen 30-Ton Hydraulic Puller for Ultra-Long Spans
Ningbo Changshi unveils a new 30-ton hydraulic puller engineered for ultra-long spans and high-altitude projects — higher capacity, smarter controls, and safer operation.
2025/11/03
MORE
Case Study: Conquering the Andes – Stringing a 500kV Transmission Line in High-Altitude Mountainous Terrain
A South American utility faced extreme altitudes and 1,500m spans. Learn how Ningbo Changshi's heavy-duty 22-ton hydraulic puller provided the power to complete the 500kV project.
2025/11/02
MORE
Case Study: Minimizing Disruption in Southeast Asia – Laying 15km of Urban Power Cable with Our Trenchless Solution
A major contractor in Southeast Asia faced a "no-dig" challenge. See how Ningbo Changshi's complete underground cable laying equipment solution helped them succeed.
2025/11/02
MORE
Get the latest price? We'll respond as soon as possible(within 12 hours)
