What critical factors are considered during the planning and design phase of an OHTL project?
2025-07-18Effective OHTL planning involves:
-
Voltage and Capacity Requirements: Determining the appropriate conductor type, size, and insulation based on the power to be transmitted.
-
Geographical and Environmental Conditions: Analyzing terrain, climate (wind, ice, temperature extremes), and potential environmental impacts (e.g., sensitive habitats, visual aesthetics).
-
Right-of-Way (ROW) Acquisition: Securing the necessary land corridors for the line.
-
Safety Clearances: Ensuring adequate separation from ground, structures, and other utilities to prevent hazards.
-
Cost-Effectiveness and Maintainability: Balancing initial investment with long-term operational and maintenance costs. Our solutions support comprehensive project planning, providing the precise tools needed for diverse environmental and operational challenges.